Multi-Max has capability to design (both thermal and mechanical), manufacture, supply, erect and commission complete range of shell and tube heat exchangers for different applications.
Shell & Tube Application: |
|
Design Code : |
|
Design Software : |
|
Types : |
|
Heat Transfer Area: |
|
Shell Diameter: |
|
Tube Length : |
|
Tubesheet Thickness: |
|
Hole Diameter: |
|
Tubes: |
|
Tubes: |
|
MOC: |
|
Inspection Agencies: |
|
Client: IOCL Paradip
Item Name: Vacuum Residue/LP Steam Generator
Description : 6 Nos of these Kettle type Heat Exchanger each weighing 56.5 tons were fabricated for IOCL Paradip Greenfield Refinery Project under Foster Wheeler. The tubesheet was 165mm thk with 2508 holes and was drilled on our inhouse Batliboi CNC Machine. Fabrication of accentric cone of 28mm thk was the major challenge.
Client: IOCL Barauni
Item Name: Tube Bundle for RFCCU Heat Exchanger
Description : A 12 Ton tube bundle having SA213TP304L tubes and a 145mm thick Carbon Steel tube sheet having 10mm SS304L weld overlay. The weld overlay was done in-house by Lloyds approved welders. The tube bundle was hydrotested at 66 kg/cm2(g) pressure.
Client: Tata Chemicals, Babrala
Item Name: Distillation Tower Preheater
Description : Double Stack complete SS304L metallurgy heat exchangers. Scope included mechanical design and supply under PDIL inspection. The fabrication was challenging as it involved maintaining the circularity of a thin stainless steel shell while nozzles and flanges were being attached to it.
Client: Century Pulp & Paper, Lalkuan
Item Name: HP Heaters
Description : High Pressure Heaters for pre-heating boiler feed water using Steam. MultiMax supplied 3 Nos such heaters undertaking complete thermal (using HTRI) and mechanical design and supply including design and performance guarantees. The Heaters were hydrotested at 156 kg/cm2(g) pressure.
Client: IOCL Mathura
Item Name: Non-Ferrous tube bundles
Description : MultiMax supplied tube bundles made of Naval Brass tube sheet and Admiralty Brass tubes to IOCL. Care was taken during fabrication to maintain dimensions of tube sheet and tubes since brass being a soft material is very susceptible to deformations during fabrication. The tube bundles were delivered 4 months ahead of their delivery date.